PT slab survey

Post-tension cable location

Post-tensioned slabs carry steel tendons stressed to enormous loads inside plastic or metal ducts, and they rarely run exactly where the drawings say. GPR traces the actual tendon paths across the work area so every planned penetration keeps a safe margin from every cable.

Scope

What this covers

  • Tendon path tracing and marking across the affected bays

  • Cross-referencing against structural drawings where the builder can supply them

  • Offset marking so trades see the exclusion zone, not just the cable line

  • Escalation advice when a required penetration cannot achieve clearance

Timing

When it's needed

Fit-outs in post-tensioned commercial buildings generate constant demand: new risers, plumbing penetrations, anchor fixings for services and equipment. Residential apartment towers built since the 1990s are commonly post-tensioned too, which surprises owners planning renovations.

Treat every unidentified object in a slab as live and every unmarked area as unscanned. If a cut nicks a conduit or a tendon, stop work, keep people clear of the slab face and get the relevant specialist on site before anything else happens.

Quote variables

What shapes the scope

Concrete scanning is an interpretive skill, not just a piece of equipment: ask any operator about their training, their experience on your slab type and how they express confidence in their marks. For excavation work, lodge a free enquiry with Before You Dig Australia and keep the plan responses on hand; field locating complements those plans rather than replacing them.

Scanning services

Start your quote

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.